01.11.2025 Back
As part of the R-69 Kyiv–Vyshhorod–Desna–Chernihiv Bridge Rehabilitation Project, Doğuş Construction carried out the demolition of damaged structures at km 29+110, the construction of new reinforced concrete elements, pile foundations and load-bearing systems, as well as the installation of steel girders manufactured in the United Kingdom.

Implemented through a collaboration between Ukraine and the United Kingdom, the project was financed by UK Export Finance (UKEF) and Citibank. The rehabilitated bridge restores safe transportation between settlements in the Vyshhorod region, providing significant convenience for local residents commuting to and from the capital.