The project involves the construction of two intersecting metro lines (10,9+6,95 km) including the supply and installation of electromechanical systems and commissioning works of 14 stations.
- Location Istanbul / TÜRKİYE
- Client Istanbul Metropolitan Municipality, Directorate of Rail Systems, Department of Transportation
- Length of the Main Line 17,85 km - TBM and NATM
- Length of the TBM Tunnel 25,37 km
- No. of Stations 14 (6 + 8) - Full Underground
- Earthworks 1.251.000 m³ - Deep Excavation
768.000 m³ - NATM Tunnel Excavation
- Shoring Works 144.000 m² - Deep Excavation
- Structural Concrete 467.000 m³
- Electromechanical Works Power Supply and Traction Power System
Rigid Catenary System (RCS) Works
Signalization System (CBTC)-UTO-SIL4
Telecommunication Systems
Escalators and Elevators
Environmental Control Systems
Emergency Tunnel Ventilation Systems