01.09.2026 Back
Doğuş Construction has reached another major milestone in the Sofia Metro Line III Slatina Project. The TBM (Tunnel Boring Machine) carrying out the tunneling works has achieved breakthrough at MC1 Station.

Delivered by the DVU21 Joint Venture led by the company, the project will help strengthen Sofia’s modern and sustainable public transportation infrastructure upon completion of the 5.67-kilometer metro line with 6 stations.